Contractors lower the cab into place for Dover's new Air Traffic Control Tower Oc.t 15. The new tower is scheduled to be completed in April 2009. (U.S. Air Force photo/Roland Balik)
Contractors lower the cab into place for Dover?s new Air Traffic Control Tower Oc.t 15. The new tower is scheduled to be completed in April 2009. (U.S. Air Force photo/Roland Balik)
Contractors lower the cab into place for Dover?s new Air Traffic Control Tower Oc.t 15. The new tower is scheduled to be completed in April 2009. (U.S. Air Force photo/1st Lt. Lori Houck)