Photos

Keyword: Category: Tag: Sort By:
A 436th Civil Engineer Squadron snow plow works to clear the Dover Air Force Base flight line during the nor'easter March 2. According to the 436th Operations Support Squadron Weather Flight, from the time the snow started falling at about 4:00 p.m. March 1, until it stopped at about 3:00 p.m. March 2, a total of 10.3 inches of snow fell. (U.S. Air Force Photo/2nd Lt. Brian Maguire)


Noreaster

A 436th Civil Engineer Squadron snow plow works to clear the Dover Air Force Base flight line during the nor'easter March 2. According to the 436th Operations Support Squadron Weather Flight, from the time the snow started falling at about 4:00 p.m. March 1, until it stopped at about 3:00 p.m. March 2, a total of 10.3 inches of snow fell. (U.S. Air Force Photo/2nd Lt. Brian Maguire)

Related Imagery

090301-F-7917M-031.JPG

DOWNLOAD PHOTO
(0.83 MB)



Tags




< Back to Main Gallery